Nine steps from survey to installation, and who owns each one.
The hardest part of remote work is measurement. We send operators a step-by-step survey guide, and for critical projects our own team measures on site.
Then, in order: 3D visualisation, sign-off, production drawing, production, QC, packing, freight and installation.
Packing is the step most firms underrate. A letter corner crushed in transit cannot be repaired on site, so we ship with corner protection and surface film.
Customs paperwork is planned at quotation stage, not improvised during shipping.
On installation day one person owns the process — the number the operator calls stays the same from start to finish.